Description
Merchandise Description
RV series Attributes
- RV – Dimensions:030-040-050-063-075-one zero five-a hundred and ten-130-one hundred fifty
- Enter Alternatives: with input shaft, With Square flange,With Enter Flange
- Enter Electricity .06 to 11 kW
- RV-Size from 030 to 105 in die-solid aluminium alloy budy and over one hundred ten in forged iron
- Ratios amongst five and a hundred
- Max torque 1550 N.m and admissible output radial masses max 8771 N
- Aluminium units are supplied full with synthetic oil and permit for universal mounting positions, with no need to have to modify lubricant amount
- Worm wheel: Copper (KK Cu).
- Loading ability in accordance with: ISO 9001:2015/GB/T 19001-2016
- Measurement 030 and above are painted with RAL 5571 blue
- Worm gear reducers are offered with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Alternatives: torque arm, output flange, viton oil seals, minimal/large temperature oil, filling/drain/breather/stage plug,Small gap
Basic designs can be applied to a vast range of power reduction ratios from 5 to a thousand.
Guarantee: One year from day of shipping and delivery.
| WORM GEARBOX | |||||
| SNW SERIES | Output Pace Variety: | ||||
| Type | Old Sort | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
| SNW030 | RV030 | 21N.m | φ14 | Applicable Motor Power: | |
| SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
| SNW050 | RV050 | 84N.m | φ25 | Enter Options1: | |
| SNW063 | RV063 | 160N.m | φ25 | With Inline AC Motor | |
| SNW075 | RV075 | 230N.m | φ28 | Input Options2: | |
| SNW090 | RV090 | 410N.m | φ35 | With Square flange | |
| SNW105 | RV105 | 630N.m | φ42 | Enter Options3: | |
| SNW110 | RV110 | 725N.m | φ42 | With Input Shaft | |
| SNW130 | RV130 | 1050N.m | φ45 | Enter Options4: | |
| SNW150 | RV150 | 1550N.m | φ50 | With Enter Flange |
Starshine Drive
ZheJiang Starshine Travel Co.,Ltd,the predecessor was a state-owned military mould business, was established in 1965. Starshine specializes in the complete power transmission resolution for high-stop gear manufacturing industries based on the aim of “Platform Item, Software Layout and Professional Support”.
Starshine have a robust technological power with over 350 staff at current, like above 30 engineering professionals, thirty top quality inspectors, covering an region of 80000 sq. meters and kinds of superior processing devices and testing equipments. We have a excellent foundation for the market application development and service of higher-end velocity reducers & variators proudly owning to the provincial engineering engineering study centre,the lab of gear velocity reducers, and the base of contemporary R&D.
Our Group
Quality Handle
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,JCPTer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the JCPTer’s position on the finished product quality verification, in order to ensure the quality of
JCPTer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Packing
Shipping and delivery
